
Madison Public School gutted and moved an existing pre-fabricated metal building from a former rural school to a location adjacent to their existing elementary school in Madison. The renovation project completely renovated the interior, adding toilets, athletic flooring, concession stand, mezzanine mechanical room, and a connection link to the existing school. The exterior metal panels were repaired and a brick wainscot was added. Complete new mechanical and electrical systems were provided.